Projects

Our Projects

Hundreds of projects executed across our different activity sectors spanning a multitude of services. 

14 District Digital Control Centers Upgrade (14DCC)

Activity Sector
Control Centers & SCADA Systems
Location
Egypt
End Client
Egyptian Electricity Holding Company (EEHC)
Completion Date
Running
Technology Partner
Schneider Electric
Client Consultant
DNV (for North Cairo Electricity Distribution Company - Phase 1)
Lahmeyer (for South Cairo Electricity Distribution Company - Phase 1)
Services
EPC, Testing, Commissioning & Start-up
Package
Turnkey Electrical Package

Al Fajij 220KV AIS Substation Extension

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Alstom
Services
EPC, Testing, Commissioning & Start-up, Supervision

Tobruk 4 x 175MW Simple Cycle Power Plant

Activity Sector
Power Plants - Simple Cycle Gas Turbine Power Plants
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
General Electric (Units 1 & 2) Ansaldo Energia (Units 3 & 4)
Client Consultant
Arabian Consultancy Engineering Services Company (ACESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Instrumentation & Control, Mechanical and Electrical Installation, Start-up Works

Sabha 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Tobruk 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Bany Walid 500KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Hoon 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Al Beida 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Hay El Salam 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
Running
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

GECOL Building 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
Running
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Civil, Inland Logistics, MEP, Security, Testing, Commissioning & Start-up, Supervision

Janzour Center 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2022
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Civil, Inland Logistics, MEP, Security, Testing, Commissioning & Start-up, Supervision

ASORC Naphta Complex 220/11/11KV GIS Substation

Activity Sector
Petrochemical Facilities
Location
Egypt
End Client
Assiut Oil Refining Company (ASORC)
Completion Date
2021
Technology Partner
General Electric
Client Consultant
Enppi
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Suez 500KV AIS Substation Extension

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – AIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2021
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Assiut East 66/22/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2021
Technology Partner
Sieyuan Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Madinaty 2 220/66/22KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2021
Technology Partner
Sieyuan Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Obari 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2021
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Civil, Inland Logistics, MEP, Security, Testing, Commissioning & Start-up, Supervision

Lusail Underground Light Rail Transit (LRT)

Activity Sector
Railways
Location
Qatar
End Client
Qatar Railways Company
Completion Date
2020
Technology Partner
Alstom Transport
Services
Procurement, Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up

New National Energy Control Center (N-NECC)

Activity Sector
Control Centers & SCADA Systems
Location
Egypt
End Client
Egyptian Electricity Holding Company (EEHC)
Completion Date
2020
Technology Partner
Siemens
Client Consultant
EDF Energy
Services
Consultancy: Design & Engineering, Consultancy: Project Management
Package
Consultancy for Siemens for Building Works During Tendering Stage

Nubaria III 1 x 750 MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Middle Delta Electricity Production Company
Completion Date
2020
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

South Helwan 3 x 650 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
Upper Egypt Electricity Production Company (UEEPC)
Completion Date
2020
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Al Shabab 2 x 750 MW Combined Cycle Add-on Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2020
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Instrumentation & Control, Package 1: Electrical, Start-up Works

Al Shabab 2 x 750 MW Combined Cycle Add-on Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2020
Technology Partner
AC Boilers
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Package 2: Heat Recovery Steam Generator Works

El Khoms 11 Gas Turbine Units Simple Cycle Power Plant

Activity Sector
Power Plants - Simple Cycle Gas Turbine Power Plants
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2020
Technology Partner
ABB
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

West Damietta 1 x 750MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2020
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Instrumentation & Control, Package 1: Electrical, Start-up Works

West Damietta 1 x 750MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2020
Technology Partner
AC Boilers
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Package 2: Heat Recovery Steam Generator Works

Temai Emdeed 500/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2020
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ismalia East 500/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2020
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Beni Sweif 500/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2019
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Zohr Gas Field Energy Control System

Activity Sector
Petrochemical Facilities
Location
Egypt
End Client
Belayim Petroleum Company (PetroBel)
Completion Date
2018
Technology Partner
Schneider Electric
Client Consultant
Eni
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Mostathmereen 220/66KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2018
Technology Partner
General Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Mall of Egypt

Activity Sector
Commercial Buildings
Location
Egypt
End Client
Majid Al Futtaim Group
Completion Date
2017
Technology Partner
Schneider Electric
Services
MEP

Irqah 380/132/13.8KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2017
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Training Program for Solar Power Installation

Activity Sector
Renewable Energy – Solar Power
Location
Egypt
Completion Date
2017
Technology Partner
Sun Power
Services
Mechanical Installation, Electrical Installation

Al Nahda 132/13.8KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2017
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Maazalia 132/138.8KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2017
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Zamel 132/13.8KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2017
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Ortawia 132/13.8KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2017
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Qatar National Bank (QNB) Al Ahli Data Center

Activity Sector
Data Centers
Location
Egypt
End Client
Qatar National Bank (QNB) Al Ahli
Completion Date
2016
Technology Partner
Schneider Electric
Services
EPC

Giza North 750MW Module III Combined Cycle Power Plant Extension

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Cairo Electricity Production Company (CEPC)
Completion Date
2016
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

West Damietta 500MW Simple Cycle Power Plant (Fast Track)

Activity Sector
Power Plants - Simple Cycle Gas Turbine Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2016
Technology Partner
General Electric
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

New Assiut 1000MW Simple Cycle Power Plant (Fast Track)

Activity Sector
Power Plants - Simple Cycle Gas Turbine Power Plants
Location
Egypt
End Client
Upper Egypt Electricity Production Company (UEEPC)
Completion Date
2016
Technology Partner
General Electric
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Mahmoudia 330 MW Simple Cycle Power Plant (Fast Track)

Activity Sector
Power Plants - Simple Cycle Gas Turbine Power Plants
Location
Egypt
End Client
West Delta Electricity Production Company (WDEPC)
Completion Date
2016
Technology Partner
General Electric
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Al Shifa 132/33KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2016
Technology Partner
Multiple Suppliers Procured
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Wagba Super 220/132/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Qatar
End Client
Kahramaa
Completion Date
2016
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tripoli South 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2016
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

El Tabba 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2016
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Giza North 2 x 750MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Cairo Electricity Production Company (CEPC)
Completion Date
2015
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Banha 1 x 750 MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Middle Delta Electricity Production Company
Completion Date
2015
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Ain El Sokhna 2 x 650 MW Steam (Supercritical) Power Plant Units 1 & 2

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2015
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Umm Bab 132/33/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Qatar
End Client
Kahramaa
Completion Date
2015
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Lusail Development Super-2 400/220/66/11KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Qatar
End Client
Kahramaa
Completion Date
2015
Technology Partner
Areva
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tripoli West 220KV AIS Substation Rehabilitation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2014
Technology Partner
Alstom
Services
EPC, Testing, Commissioning & Start-up

Ghadames PS#1 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2014
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ghadames PS#2 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2014
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ghadames PS#3 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2014
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Zweitina 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2014
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Madina FSC 380/33KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2014
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abu Qir 2 x 650 MW Steam (Supercritical) Power Plant Units 6 & 7

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
West Delta Electricity Production Company (WDEPC)
Completion Date
2013
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

El Galaa 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2013
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abu Arqoub 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2013
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Sarir 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2013
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Upgrading of Misurata Steam Factory 2 x 300 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Libya
End Client
Misurata Steel Factory (LISCO)
Completion Date
2012
Technology Partner
ABB
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Ghadames 400/66KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2012
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Ruwais 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2012
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Egyptian British Hatcheries

Activity Sector
Industrial Facilities
Location
Egypt
End Client
Ministry of Agriculture and Land Reclamation (MALR)
Completion Date
2010
Technology Partner
Barco International Inc.
Services
Procurement, Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up

West Delta Regional Control Center (WDRCC)

Activity Sector
Control Centers & SCADA Systems
Location
Egypt
End Client
Egyptian Electricity Holding Company (EEHC)
Completion Date
2010
Technology Partner
Alstom
Client Consultant
EDF Energy
Services
Turnkey
Package
Building Works

Rehabilitation of Aswan High Dam 12 x 175MW Hydro Power Plant

Activity Sector
Renewable Energy – Hydro Power - Large Scale Hydro Power Plants
Location
Egypt
End Client
Upper Egypt Electricity Production Company (UEEPC)
Completion Date
2010
Technology Partner
Voith Siemens - Power Machines JV
Client Consultant
Sweco
Services
Turnkey

Gulf HVDC Interconnection

Activity Sector
Power Grid Facilities – Transmission Lines - HVDC
Location
Kingdom of Saudi Arabia, Kuwait, Qatar
End Client
Saudi Electricity Company (SEC)
Completion Date
2010
Technology Partner
Areva
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Fadhili HVDC Back – to – Back Converter Stations

Activity Sector
Power Grid Facilities – Transmission Lines - HVDC
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2010
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

7 x 220KV AIS Substations Rehabilitation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Misurata 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abu Fakher 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Benghazi South 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Janzour 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up, Supervision

Sirte 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2010
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Shuqaiq 380/132/13.8KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2010
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abha East 380/132KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2010
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gamra – Ghadames – Zewra Line PS #1 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra – Ghadames – Zewra Line PS #2 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra – Ghadames – Zewra Line PS #3 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra – Ghadames – Zewra Line PS #4 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Zeraa 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Stadium 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tabba 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Agdabia 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2009
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Ras Lanouf 400KV Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2009
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Cairo North II 1 x 750 MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Cairo Electricity Production Company (CEPC)
Completion Date
2008
Technology Partner
NEM
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Heat Recovery Steam Generator Works

Sirte National Control Center (SNCC)

Activity Sector
Control Centers & SCADA Systems
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Alstom
Client Consultant
EDF Energy
Services
Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up
Package
Microwave Tower, SCADA System Installation & Adaptation Works

Tripoli National Control Center (TNCC)

Activity Sector
Control Centers & SCADA Systems
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Alstom
Client Consultant
EDF Energy
Services
Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up
Package
Microwave Tower, SCADA System Installation & Adaptation Works

Tripoli Regional Control Center (TRCC)

Activity Sector
Control Centers & SCADA Systems
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Alstom
Client Consultant
EDF Energy
Services
Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up
Package
Microwave Tower, SCADA System Installation & Adaptation Works

Doha Industrial 132 E 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Qatar
End Client
Kahramaa
Completion Date
2008
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abu Sidra North 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Qatar
End Client
Kahramaa
Completion Date
2008
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gamra – Rabta – Abu Zayan Line Rabta 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra – Rabta – Abu Zayan Line – PS #1 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra – Rabta – Abu Zayan Line – PS #2 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Zleiten 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gulf 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Fashloum 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Zawia 400KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Bir Austa Milad 400/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2008
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Cairo North I 1 x 750 MW Combined Cycle Power

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Cairo Electricity Production Company (CEPC)
Completion Date
2007
Technology Partner
Multiple Suppliers Procured
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Instrumentation & Control, Package 1: Electrical, Start-up Works

Cairo North I 1 x 750 MW Combined Cycle Power

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
Completion Date
2007
Technology Partner
NEM
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Package 2: Heat Recovery Steam Generator Works

Sedi Hamed 220KV GIS Substaion

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2007
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

DIE-3A 69/13.8KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Kingdom of Saudi Arabia
End Client
Saudi Electricity Company (SEC)
Completion Date
2006
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Attaka 1 x 150 MW + 2 x 300 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2005
Technology Partner
Emerson USA
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Abu Sultan 4 x 150 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2005
Technology Partner
Honeywell USA
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Abu Qir 4 x 150 MW Steam (Supercritical) Power Plant Upgrade

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
West Delta Electricity Production Company (WDEPC)
Completion Date
2005
Technology Partner
Honeywell USA
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

El Lahoun 2 x 400KW Mini Hydro Power Plant

Activity Sector
Renewable Energy – Hydro Power – Mini Hydro Power Plants
Location
Egypt
End Client
Upper Egypt Electricity Production Company (UEEPC)
Completion Date
2005
Technology Partner
Alstom
Services
Turnkey

El Zafarana 2 1 x 100 MW Wind Farm Power Plant

Activity Sector
Renewable Energy – Wind Farms
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2005
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Instrumentation & Control, Mechanical and Electrical Installation, Start-up Packages

Libya National Control Centers OPGW Project

Activity Sector
Control Centers & SCADA Systems
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2005
Technology Partner
Alstom
Client Consultant
EDF Energy
Services
Mechanical Installation, Electrical Installation, Civil, In-land Transportation, MEP, Testing, Commissioning & Start-up
Package
Building Works, SCADA System Installation & Adaptation Works

12 x 30/11KV GIS Substations

Activity Sector
Power Grid Facilities – Substations – GIS – 30KV or 22KV Ratings
Location
Libya
End Client
Electrical Projects Company (ELPCO)
Completion Date
2005
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Cairo 500KV AIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – AIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2005
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Benghazi Central 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2005
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Zawya 220/30KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2005
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Azhar Tunnel

Activity Sector
Tunnels
Location
Egypt
End Client
Egypt's Ministry of Transport
Completion Date
2004
Technology Partner
Campenon Bernard (Tunnel Feeders)
Spie Enertrance (Tunnel Works)
Services
Electrical Installation, Testing, Commissioning & Start-up

Motobas 66/11KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2004
Technology Partner
Schneider Electric
Services
EPC, Testing, Commissioning & Start-up

Ben Ghashier 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Zwarah 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Zlieten 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tripoli Bottling Company 11/0.4KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 11KV Ratings or Less
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ras Lanouf 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Benghazi North 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2004
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Fassy 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Zlieten University 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Boaishy 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Obari 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Fajij 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Traghen 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2003
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Sheikh Zayed Pumping Station

Activity Sector
Environmental & Sanitation Systems – Pump Stations
Location
Egypt
End Client
Ministry of Water Resources and Irrigation
Completion Date
2002
Technology Partner
Balfour Kilpatrick
Services
Procurement, Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up

Al Gharbeyat 66KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Services
EPC, Testing, Commissioning & Start-up

Al Kusair 66KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Services
EPC, Testing, Commissioning & Start-up

Abu Eissa 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Hira 30KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Orouba 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tobrok 220/66/11KV GIS Substation Extension

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2002
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ain El Seira 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2002
Technology Partner
Hyundai
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

(34-36) 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Janzour 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Mangoub 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Halab Street 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abou Zian 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gabal El Asfar Wastewater Treatment Plant

Activity Sector
Environmental & Sanitation Systems – Wastewater Treatment Plants
Location
Egypt
End Client
Construction Authority for Potable Water and Wastewater (CAPW)
Completion Date
2001
Technology Partner
Balfour Kilpatrick
Services
Mechanical Installation, Electrical Installation

Sebha – Hamza Agricultural Project 66KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Ajdabia – Tobruk Road 66/11KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Sebha El Gadid 66/11KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Jaref 66/11KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Al Qurdabia – Sirte 66/11KV AIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – AIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2001
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Cairo East 220KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2001
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Sabtia 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2001
Technology Partner
Schneider Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tripoli 11KV & 30KV 97Km Network

Activity Sector
Power Grid Facilities – Transmission Lines – MVAC
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up

Beer El Abd 220/66/22KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2000
Technology Partner
Mitsubishi Electric
Services
EPC, Testing, Commissioning & Start-up

Ayoun Moussa 2 x 320 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
2000
Technology Partner
Balfour Beatty Kipatrick
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Sidi Krir 2 x 320 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
West Delta Electricity Production Company (WDEPC)
Completion Date
2000
Technology Partner
CEGELEC
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
EPC, Testing, Commissioning & Start-up
Package
Electrical, Instrumentation & Control, Start-up Works

Bab Tarhona, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Souq Al Qoubab, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Saha El Shabia, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Benghazi End 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Civil, MEP, Testing, Commissioning & Start-up

Gamra 1 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gamra 2 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gemines 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
2000
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ayoun Moussa 500/220KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
2000
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Hadaek, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1999
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Rousat, Benghazi 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1999
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Sidi Eissa, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1999
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Port Said East 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1999
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Greater Cairo Metro Line 2 Phases 1A, 1B, 2A & 2B

Activity Sector
Railways
Location
Egypt
End Client
Egyptian National Railways (ENR)
Completion Date
1998
Technology Partner
Spie Enertrance
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Hadaba, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1998
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Menna, Benghazi 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1998
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Libya Bank, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1998
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tyeba 500/400/220/132/22KV AIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – AIS – 500KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1998
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ghaza North 220/22KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Palestine
End Client
Palestinian Energy Authority
Completion Date
1998
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ghaza West 220/22KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Palestine
End Client
Palestinian Energy Authority
Completion Date
1998
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tripoli Road, Benghazi 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1997
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

The Great Man-Made River, Benghazi 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
Great Man Made River Authority (GMMRA)
Completion Date
1997
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Gamahira Street, Tripoli 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1997
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Amman South 400/132/33KV AIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – AIS – 500KV
Location
Jordan
End Client
National Electric Power Company (NEPCo) Jordan
Completion Date
1997
Technology Partner
Schneider Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Wadi El Nakra 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1997
Technology Partner
Alstom
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Sidi Krir 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1997
Technology Partner
Schneider Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Stadium 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1997
Technology Partner
Merlin Gerin
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Al Arish 1 x 300 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
East Delta Electricity Production Company (EDEPC)
Completion Date
1996
Technology Partner
Nouva Cimi Montoubi
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

El Wallidia New Assiut 1 x 300 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
Upper Egypt Electricity Production Company (UEEPC)
Completion Date
1996
Technology Partner
ABB
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Station No. 1, Benghazi 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1996
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Ras Lanouf 30/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 30KV or 22KV Ratings
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1996
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Tobruk 3.3KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 11KV Ratings or Less
Location
Libya
End Client
General Electricity Company of Libya (GECOL)
Completion Date
1996
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Greater Cairo Metro Line 2 Workshop Facilities

Activity Sector
Railways
Location
Egypt
End Client
Egyptian National Railways (ENR)
Completion Date
1996
Technology Partner
Spie Enertrance
Services
Mechanical Installation, Electrical Installation, Operation & Maintenance, Testing, Commissioning & Start-up

El Sallum 220KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1996
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Sadat 220KV AIS Substation Extension

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1996
Technology Partner
Schneider Electric
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Siuf 220/66/11KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1996
Technology Partner
Mitsubishi Electric
Services
EPC, Testing, Commissioning & Start-up

El Bassateen to Wadi Hoof 66KV 25Km Overhead Transmission Line

Activity Sector
Power Grid Facilities – Transmission Lines - HVAC
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1995
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Civil, Testing, Commissioning & Start-up

Cairo West 2 x 320 MW Steam (Supercritical) Power Plant

Activity Sector
Power Plants - Steam (Supercritical) Power Plants
Location
Egypt
End Client
Cairo Electricity Production Company (CEPC)
Completion Date
1995
Technology Partner
ABB
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Electro-Mechanical Installation, Instrumentation & Control, Start-up Works

Damanhour 4 x 50 MW Combined Cycle Power Plant

Activity Sector
Power Plants - Combined Cycle Power Plants
Location
Egypt
End Client
Middle Delta Electricity Production Company
Completion Date
1995
Technology Partner
NEM
Client Consultant
Power Generation, Engineering & Services Company (PGESCo)
Services
Procurement, Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up
Package
Heat Recovery Steam Generator Works

New Beni Suef 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1995
Technology Partner
Siemens
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Arish 220/22KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1995
Technology Partner
Sprecher Energie
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Walidia – Assiut 220KV GIS Substation

Activity Sector
Power Grid Facilities – Substations – GIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1995
Technology Partner
ABB
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Dokki 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1994
Technology Partner
Merlin Gerin
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Ahleya Abu Zaabal 66/11KV GIS Substation

Activity Sector
66KV or 60KV Ratings, Power Grid Facilities – Substations – GIS – 69KV
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1994
Technology Partner
Merlin Gerin
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

El Bostan 220/66/11KV AIS Substation

Activity Sector
Power Grid Facilities – Substations – AIS – 220KV & 132KV Ratings
Location
Egypt
End Client
Egyptian Electricity Transmission Company (EETC)
Completion Date
1994
Technology Partner
Isolux Wat
Services
Mechanical Installation, Electrical Installation, Testing, Commissioning & Start-up

Abu Zaabal 500/220/66/11KV GIS Substation

Activity Sector
400KV & 380KV Ratings, Power Grid Facilities – Substations – GIS – 500KV
Location
Egypt